Thurston Regional Planning Council awards over $17 million for transportation projects

Posted

Transportation improvements are coming to communities across the Thurston region, supported by more than $17 million in funding allocated by the Thurston Regional Planning Council (TRPC).

“These projects will help communities throughout Thurston County strengthen and improve the transportation system, making it safer and easier for people to get where they need to go,” said Paul Brewster, planning manager at TRPC.

The funding comes from two Federal Highway Administration (FHWA) grant programs, as well as approximately $1.2 million in non-federal funding. 

TRPC is responsible for awarding this funding as part of its role as the Thurston region’s federally designated Metropolitan Planning Organization (MPO).

The process for selecting local transportation projects, programs, and services to receive funding takes place every other year. 

This year, TRPC received 21 proposals from 11 applicant organizations requesting a combined $29.9 million — nearly twice the amount of funding available.

TRPC will award full or partial funding to 20 projects. 

The awardees and their awarded projects are listed below.

  • City of Lacey: 
    • College Street Corridor Improvements: This phase of the project will acquire the right-of-way for a reconstruction project on College St SE between 18th Ave SE and Lacey Blvd SE. The project would add a roundabout at 16th Ave SE, widen sidewalks, and add lighting and other pedestrian improvements.
    • Karen Fraser Woodland Trail Extension Feasibility Study: This study will determine the feasibility of extending the Karen Fraser Woodland Trail from Woodland Creek Community Park to McAllister Grove Community Park. The study will include an implementation strategy that identifies potential funding sources.
  • City of Olympia:
    • Capitol Corridor: This project will transform a portion of Capitol Way S from two traffic lanes in each direction to one lane in each direction with a center left-turn lane. Additional improvements include resurfacing the pavement, enhanced bike lanes, an enhanced crosswalk at 24th Avenue, and upgraded transit stops.
  • City of Tenino:
    • Sussex Avenue Sidewalk Improvements: This project will replace sidewalks along State Route 507 in downtown Tenino.
  • City of Tumwater:
    • Deschutes Valley Trail: This project will construct a paved trail connecting Brewery Park to E Street in Tumwater. This segment will become part of the proposed Deschutes Valley Trail, which would eventually connect to Pioneer Park.
  • City of Rainier:
    • Rectangular Rapid Flashing Beacons at Thurston County Trail Crossings: This project will design and construct lighted crossings where the Yelm-Rainier-Tenino Trail crosses Centre Street and Minnesota Street.
    • State Route 507 Roundabouts Planning Study: This study will develop preliminary plans for the construction of two roundabouts along SR 507, at Centre Street and Minnesota Street.
  • City of Yelm:
    • Washington Ave SE/McKenzie Ave SE One-Way Couplet: This project aims to make progress on transitioning Washington Ave SE and McKenzie Ave SE into parallel, one-way streets going in opposite directions. The goal of the project is to improve traffic circulation and safety in downtown Yelm.
  • Intercity Transit:
    • Smart Corridors Cloud-Based Transit Signal Priority (TSP) Implementation: This project will deploy updated Transit Signal Priority (TSP) systems, which alter the timing of traffic intersection signals to prioritize delayed buses. The updated TSP systems also account for the movement of pedestrians, bicyclists, and passenger vehicles.
    • West Olympia Transit Center Study: This study will identify potential locations for a transit center in Olympia's west side. This would replace the transfer center at Capital Mall, which is difficult for buses to access and therefore expensive to serve.
    • Walk N Roll: This program provides education to support community members in walking, rolling, bicycling, and using transit.
  • Nisqually Indian Tribe:
    • Nisqually Reservation Roads Chipseal Project: This project will apply a chip seal coating to preserve portions of roadways on the Nisqually Indian Reservation
  • Thurston County:
    • Tilley Road Bridge Replacement: This project will replace the Tilley Road Bridge over Beaver Creek. The current bridge is 72 years old and has no shoulder to accommodate bicyclists and pedestrians.
    • 196th Ave SW/Elderberry St SW: This project will construct a roundabout at 196th Ave SW and Elderberry St SW in Grand Mound. Additional improvements will include sidewalks, bike lanes, and lighting.
    • Old Pacific Highway SE/Kuhlman Rd SE Intersection Improvements: This project will construct a roundabout at Old Pacific Highway and Kuhlman Rd SE. The roundabout is intended to reduce congestion and improve traffic safety.
    • Meridian Rd SE/Mullen Rd SE Intersection Improvements: This project will acquire the right-of-way and construct a roundabout at the intersection of Meridian Rd SE and Mullen Rd SE. A roundabout has been identified as the preferred solution to reduce congestion and improve traffic safety.
  • Thurston Regional Planning Council:
    • Thurston County Bicycle Map: This project will update the Thurston County Bicycle Map. The map is made available online and in print, free of charge.
    • Regional Trails Work Program: This supports the implementation of the Thurston Regional Trails Plan starting in 2031. The Plan facilitates regional coordination to build out a countywide trail network.
    • Regional Multimodal Level of Service: This will advance the Regional Multimodal Level of Service (MMLOS) project, which explores how the Thurston region measures how the transportation system is performing not just for drivers, but also for pedestrians, bicyclists, and transit users. The next phase of this project would acquire needed data and integrate performance measures into regional plans and programs.
  • Town of Bucoda:
    • Main Street Stormwater Improvement Project: This project will add stormwater infrastructure to Bucoda's Main Street, as part of the town's sidewalks project.

The federal funding supporting the awarded projects comes from FHWA’s Surface Transportation Block Grant (STBG) and Congestion Mitigation and Air Quality Improvement Program (CMAQ). STBG funds support projects that maintain and improve transportation infrastructure. CMAQ funds support projects that reduce traffic congestion and improve air quality.

The non-federal funding supporting the awarded projects comes from the Rural Community Support Program (RCSP). 

TRPC, in partnership with Thurston County and the City of Lacey, established the RCSP to support small transportation projects that are impactful for the region’s rural communities.

More information about the awarded projects and their selection process is available on TRPC’s website at https://www.trpc.org/879/Federal-Funding-Call-for-Projects.

TRPC is a 23-member council of governments that offers broad representation to decision-making on regional priorities including transportation, growth management, and environmental quality.

 TRPC is comprised of representatives from Thurston County city and county governments, tribal nations, school districts, colleges, and a variety of local special districts. 

Learn more at www.trpc.org.